The quality management of construction process involves many departments. The following problems are commonly occurring:
- Have all the preparing work been made enough at present?
- How about the mechanical drawing status of each discipline?
- How many personal reports have not been made? How many team/project reports have or have not been made?
- How to count the sampling rate of welded junction in time and give early warning to the inspection types that fail to reach the sampling rate?
- How to track the key welded junctions and mark the status of welded junctions?
- After assigned the inspection work, how can the inspector submit the results of the welded junction conveniently and timely?
- How to solve the WPS inconsistency problem between design phase and inspection phase?
- How to manage the welder's qualification and personnel change?